Water Softener New installation

 

Water Softener New installation

DETAILS

First-time installation, includes up to 10 ft of piping to drain, and required shut-off valves and fittings

FEATURES

  • Install the new water softener according to manufacturer’s instructions
  • Provide miscellaneous fittings, as required, and up to one (1) foot of piping to connect the existing piping to the new water softener
  • Test the water softener to ensure proper operation
  • Clean up the work area once the water softener is installed and prepare product packaging for disposal by the Customer
  • Review installation with the Customer upon completion

SPECIFICATIONS

WARRANTY

This product has no warranty.

OUR RETURN POLICY

PRODUCT AVAILABILITY

RATINGS & REVIEWS